CERRO PRIETO PROJECT : Phase 1 Drill Results

Hole From To Length TT* Au Ag Cu Pb Zn Mo
(m) (m) (m) (m) (g/t) (g/t) (%) (%)
CP001 54.9 152 97.1 53.5 0.644 4.9 0.13 0.38
incl. 71.5 74 2.5 1.4 2.008 94.1 0.5 0.92
incl. 108 109.9 1.9 1.1 1.761 2.5 0.14 0.52
incl. 137 152 15 8.3 2.449 3.2 0.24 0.56
 
CP002 169.2 256.2 87 47 0.109 50.8 0.46 1.01
incl. 220.6 231.8 11.2 7 0.214 361.8 2.4 4.76
 
CP003 145 202.5 57.5 33.8 0.99 14.9 0.23 0.66
incl. 179.5 187 7.5 4.4 0.31 70.7 0.67 1.42
incl. 194.5 202.5 8 4.7 6.05 7.8 0.36 1.12
incl. 197 202.5 5.5 3.2 8.34 6.2 0.35 1.04
 
CP004 286.5 329.5 43 24.5 0.31 8.1 0.72 2.12
incl. 291 306.5 15.5 8.8 0.59 18.7 1.52 3.51
incl. 292.9 295.9 3 1.7 0.36 64.8 6.61 5.39
 
CP005 7 88.5 81.5 39.5 1.16 12 0.06 0.18
incl. 58.5 64.1 5.6 2.7 11.94 10.2 0.1 0.29
incl. 74.1 76.3 2.2 1.1 OPEN STOPE
 
CP006 157 172 15 11.3 0.5 2.9 0.21 1.09
incl. 172 179 7 5.5 OPEN STOPE
 
CP007 84.5 114.3 29.8 22.5 1.14 52.9 0.23 0.51
incl. 89 99 10 7.6 1 139.9 0.5 1.06
incl. 91.5 97.6 6.1 4.6 1.1 212.1 0.58 1.24
incl. 101.8 103.9 2.1 1.6 3.23 33.7 0.2 0.37
incl. 110.8 114.3 3.5 2.6 2.72 7 0.09 0.2
and 114.3 122 7.7 5.8 OPEN STOPE
 
CP008 210.7 259 48.3 25 0.54 20.4 0.45 0.99
incl. 236.2 256 19.8 10.2 0.9 27.6 0.67 1.35
incl. 233.5 245 11.5 6 0.6 63.5 0.59 1.12
 
CP009 255 302.5 47.5 32 0.32 14.9 0.91 2.59
incl. 280.5 289 8.5 5.7 0.75 59.7 3.3 5.45 0.06
incl. 283.5 286.2 2.7 1.8 0.59 83.1 2.6 10.35 0.05
 
CP010 289.8 367 77.2 42 0.28 4.9 0.36 1.07
incl. 331.5 343 11.5 6.3 1.21 11.5 0.98 2.29
incl. 330 337.5 7.5 4.1 0.96 9.1 1.27 2.22 0.02
 
CP011 363 424 61 30 0.15 13.3 0.14 0.74 2.02
incl. 391 394 3 1.165 0.39 4.2 0.07 0.57 2.9 0.03
incl. 402.5 411 8.5 4.2 0.19 79.6 0.78 3.71 6.13
incl. 402.5 404 1.5 0.7 0.4 79.3 2.07 8.06 9.35 0.01
incl. 401.3 404 2.7 1.3 0.41 55.1 1.33 5.06 6.27 0.02
 
CP012 40 59 19 12 0.46 2.7 0.07 0.21
incl. 57.1 59 1.9 1.2 4.16 6.2 0.08 0.27
  59 OPEN STOPE
 
CP013 51.5 125.1 73.6 34 0.4 4.8 0.35 1.23
incl. 69.5 77 7.5 3.5 0.14 4.9 0.33 2.89
incl. 102 125.1 23.1 10.7 0.95 9.7 0.62 1.58
 
 
CP014 21.4 85.4 64 31 1.01 13.7 0.16 0.52
incl. 73.2 85.4 12.2 5.9 4.53 22.3 0.23 0.9
incl. 74.3 76.3 2 1 18.5 85.7 0.31 1.65
 
CP015 200 222 22 13.5 0.36 15.9 0.05 0.87 2.27
incl. 206.5 210.5 4 2.5 0.72 55.2 0.17 2.94 7.94
 
CP016 188 246 58 37.8 0.21 4.1 0.49 1.54
incl. 222 229.5 7.5 4.9 0.37 11.3 0.01 1.11 3.33
 
CP017 135.5 230 94.5 54 0.132 2.2 0.02 0.26 0.9
incl. 159.5 196 36.5 20.9 0.11 2.3 0.03 0.28 1.05
incl. 192 196 4 2.3 0.17 1 0.2 0.71 1.35
 
CP018 197.5 374 176.5 65.4 0.12 4.1 0.3 0.93
incl. 197.5 253 55 20.4 0.13 1.3 0.01 0.31 0.74
incl. 231 241 10 3.7 0.14 1.5 0.44 1.38
incl. 288 374 86 31.9 0.12 3 0.02 0.37 1.24
incl. 331 361 30 11.1 0.12 4.6 0.01 0.34 1.85
 
CP019 331 417 86 42 0.56 2.1 0.46 0.9
incl. 356 372 16 7.8 1.01 4.5 1.37 2.17
 
CP020 63 79 16 10.7 0.03 0.9 0.25 0.46
and 101 138.2 37.2 25 0.14 3.7 0.44 0.31
 
CP021 163 258.3 95.3 64 0.28 6.6 0.2 0.67
incl. 183 199 16 10.7 0.84 33 0.47 1.56
incl. 183 189 6 4 1.79 83.5 0.32 1.29
 
CP022 Hole  lost
 
CP023 103 116 13 8.7 2.8 51.5 0.24 0.5
incl. 104.1 108.5 4.4 3 7.72 17.6 0.35 0.66
incl. 110 116 6 4 0.16 93.2 0.19 0.45
 
CP024 Hole lost
 
TT* True Thickness

 


Click To View Photo Gallery

Click For Larger Image
Phase One Drilling: 
Plan View with Drill Locations, Veins on Surface and Wide Mineralized Zone 

Click For Larger Image Longitudinal Section with
drill hole locations:
Cerro Prieto Mine

Cerro Prieto Cross Section:Click For Larger Image
Section 150 North.

Click For Larger Image
Section 250 North.

Click For Larger Image
Section 350 North.

Click For Larger Image
Section 450 North.

Click For Larger Image
Section 550 North.

Click For Larger Image
Section 650 North.

 



 
View TSX.V Quote View Frankfurt Quote